Ir al contenido
FPD.DEV FPD.DEVThe Future of Display & Systems Development
  • Inicio
  • Products
  • Cursos
  • Partners
  • Contáctenos
  • Identificarse
  • 0
  • 0
FPD.DEV
  • 0
  • 0
    • Inicio
    • Products
    • Cursos
    • Partners

  • FPD.DEV
    The Future of Display Development

    Notices:   
    1.   Courses are undergoing maintenance.  Enrolled courses are unaffected.

  • Identificarse
  • Contáctenos
  1. Cursos
  2. DO-160 Display Qualification: Components, Systems and Installation
  3. 09 — Humidity, water and fluids: qualify the exposed assembly
Navegación
Inicio └DO-160 Display Qualification: Components, Systems and Installation └09 — Humidity, water and fluids: qualify the exposed assembly

DO-160 Display Qualification: Components, Systems and Installation

0 %

Completado

Contenido del curso
  • 01 — Public foundations and selected preview chapters
    • 00 — Start here: build a defensible display qualification plan
    • 01 — Public chapter: component, system and installed boundaries
    • 02 — Public chapter: read a qualification claim critically
    • 03 — Public chapter: the complete environmental test suite
    • 04 — Public chapter: temperature limits, ramp rates and decompression
  • 02 — Requirements and climatic exposures
    • 05 — Turn display functions into measurable acceptance criteria
    • 06 — Temperature and altitude: construct the procedure
    • 07 — Temperature variation: 5 and 10 °C per minute in practice
    • 08 — Pressure, altitude and rapid decompression
    • 09 — Humidity, water and fluids: qualify the exposed assembly
    • 10 — Salt spray, fungus, sand and dust
  • 03 — Mechanical and special environments
    • 11 — Shock and vibration: the fixture is part of the argument
    • 12 — Explosion proofness, icing and fire applicability
  • 04 — Power, EMC, lightning and ESD
    • 13 — Aircraft power: qualify the complete input path
    • 14 — EMC: emissions and susceptibility are different evidence
    • 15 — Lightning: connect equipment levels to the aircraft installation
    • 16 — Electrostatic discharge and accessible display surfaces
  • 05 — Installation and qualification planning
    • 17 — Installed display verification and human viewing conditions
    • 18 — Build the environmental qualification matrix
  • 06 — Contracts, changes and lifecycle
    • 19 — Specify the testing contract and supplier deliverables
    • 20 — Changes, anomalies, retests and qualification credit
    • 21 — Tests beyond DO-160 and the production boundary
  • 07 — Capstone, references and assessment
    • 22 — Capstone: plan qualification for a complete aircraft display
    • 23 — Reference shelf and practical worksheets
    • 24 — Knowledge check: apply the qualification principles 10 xp

09 — Humidity, water and fluids: qualify the exposed assembly

Anterior Siguiente
Fullscreen Share Forum

DO-160 Display Qualification | A-P02 — Draft / Not Released

Learning objective: Select exposure faces and acceptance criteria for Sections 6, 10 and 11.

Two laboratory environmental chambers with temperature and humidity controls.
Programmable temperature and humidity chambers. The displayed settings illustrate the apparatus; the applicable qualification plan supplies the required limits and sequence.
Photo: Cjp24 · Environmental chambers · CC BY-SA 3.0. Original image, displayed at reduced size.

Three different questions

Humidity evaluates moisture exposure over a prescribed cycle. Waterproofness addresses selected liquid-water exposures. Fluids susceptibility assesses specified chemical contacts and their consequences. Passing one does not establish the others. A front-sealed touch display can still have vulnerable rear connectors, a hygroscopic optical bond or a coating attacked by cleaners.

Numerical reference points

DO-160G Section 6 high-humidity phases use 95 ±4% relative humidity. Category A uses a 50 ±2 °C high phase and two 24-hour cycles; B uses 65 ±2 °C and ten cycles; C uses 55 ±2 °C and six cycles. The complete cycles contain changes in conditions: describing them as a constant high-temperature soak misstates the method. Use the applicable cycle figure, conditioning and timing in the standard.

Follow the moisture path

Identify the surfaces actually exposed after installation. Record display angle, drainage, seals, connector backshells and any covers or barriers. If a fixture blocks an opening that is exposed in service, it can invalidate the representation. Where a face-only requirement is intentional, state the excluded surfaces in the claim and installation instructions.

For fluids, identify the chemical, concentration, temperature, contact method, duration, cleaning or drying procedure and subsequent checks required by the selected method. If the operator uses a particular disinfectant, determine whether it is within the contracted fluid set. A vague claim of cleaning-fluid resistance does not address every formulation.

Display-specific checks

Look for haze, delamination, coating damage, discoloration, label loss, touch false activations, leakage and corrosion. Define when optical measurements occur: a wet surface can behave differently from a recovered dry surface. Record both required in-exposure behavior and the prescribed post-exposure evaluation; neither substitutes for the other.

Exercise

A water test used a protective rear cap absent from the proposed aircraft installation. Worked response: either substantiate an equivalent installed protection, revise the installation to include the qualified protection, or test the affected configuration. Do not remove the cap from the report's equipment list and continue using the original claim.

Humidity A/B/C nominal cycle comparison. Slopes are illustrative. The RH return is a control region, not a prescribed falling trace. Source: DO-160G §§6.3.1–6.3.3, printed pp. 6-2–6-4.
Humidity A/B/C nominal cycle comparison. Slopes are illustrative. The RH return is a control region, not a prescribed falling trace. Source: DO-160G §§6.3.1–6.3.3, printed pp. 6-2–6-4.

Humidity conditions: nominal cycle and required tolerances

Original comparison from DO-160G §§6.3.1–6.3.3. Nominal cycle times exclude initial stabilization and final evaluation. Follow all applicable checks and chamber requirements.
ItemABC
Initial stabilization38 ±2 °C; 85 ±4% RH38 ±2 °C; 85 ±4% RH38 ±2 °C; 85 ±4% RH
Rise2 h ±10 min2 h ±10 min2 h ±10 min
High-temperature phase50 ±2 °C65 ±2 °C55 ±2 °C
High-humidity hold95 ±4% RH; ≥6 h95 ±4% RH; ≥6 h95 ±4% RH; ≥6 h
Return phase16 h ±15 min16 h ±15 min16 h ±15 min
Return conditionsGradual decrease to 38 ±2 °C or lower; keep RH high and ≥85%SameSame
Cycles / nominal exposure2 / 48 h10 / 240 h6 / 144 h
Final powered evaluationDrain moisture, do not wipe; apply power within 1 h; warm-up ≤15 min; then required checksSameSame
  • Sobre
  • Comments (0)
Calificación
0 0

No hay comentarios por ahora

Unirse a este curso
para ser el primero en comentar.

Prev Next

Subscribe to the FPD.DEV newsletter

Get display and embedded engineering articles, Edge AI insights, tool updates and product news by email.

Thanks for registering!

Subscribe

By subscribing, you agree to receive the FPD.DEV newsletter. You can unsubscribe at any time. See our Privacy Policy.


FPD.DEV
The Future of Display & Systems Development

  • Contact Us




  • Privacy Policy

 

 

Póngase en contacto

Operated by Colabmo · Quality, operations & ERP support.


Cookie Policy

Copyright © 2024 Colabmo ​ ​
English (US) Español
Powered by Colabmo
Powered by Colabmo

Essential cookies support website functions. With your permission, Google Analytics measures visits and Microsoft Clarity records masked interactions, heatmaps and session replays on approved public pages. Optional embedded features may also contact their providers. These providers receive usage and device data; Microsoft may use data for its own purposes, including advertising. You can reject optional services and change your choice later. Política de CookiesPrivacy Policy

Allow optional cookies Only essential cookiesManage choices